Sorting, buffering and line integration

Panel Handling Line for Six-Sided Drilling Machines

FORTRAN panel handling line for six-sided drilling machines. Plan loading, drilling-machine handovers and receiving positions around the actual panel flow.

Working height950±50mm
Workpiece length250-2750mm

Product overview

FORTRAN panel handling line for six-sided drilling machines. Plan loading, drilling-machine handovers and receiving positions around the actual panel flow.

Selection checklist

Workpiece

Panel length, width, thickness and weight.

Process

Equipment inlet and outlet direction, working height and production rhythm.

On-site

Factory layout, workstation spacing and operating space.

Technical specifications

Specifications follow the product information. Confirm the supplied configuration with the FORTRAN technical team.
Working height950±50mm
Workpiece thickness10~60mm
Workpiece length250-2750mm
Speed65 M/min
Workpiece width50-1220mm

Selecting a panel handling line for six-sided drilling

FORTRAN's panel handling line for six-sided drilling connects automatic loading, six-sided drilling and unloading so panels can move through the drilling process with less manual handling.

Provide the incoming and outgoing workpiece flow, routing or processing order and the connected machine interfaces. Agree the supplied handling functions and control signals before defining the complete line.

Panel Handling Line for Six-Sided Drilling Machines buying questions

What is included in the drilling-line connection?

Identify the drilling machine, loading and unloading stations and any sorting or buffering required. Confirm the supplied equipment and control interfaces explicitly; a handling-line description does not prove that every machining component is included.

Does the six-sided drilling handling line define the drilling machine specification?

No. This page concerns the loading, transfer and unloading connections around six-sided drilling. Confirm the drilling machine separately, then provide its infeed and outfeed interfaces, panel orientation and handling sequence. The conveyor layout alone does not determine drilling accuracy or machining output.

How do I separate drilling and handling responsibilities in a proposal?

Show the drilling equipment, its expected infeed and outfeed presentation and the surrounding loading and receiving stations. Include panel dimensions, orientation and required transfer signals. Ask the proposal to identify the processing machine scope separately from conveyors, loaders and other handling equipment.

Equipment to compare or connect

Discuss this automatic six-sided panel drilling line

Product resources

Product image

Download image

Chinese / English specifications

Download details

Data version: 2026-09-30· Original product source

Discuss your equipment needs with us

FORTRAN

Packaging · Conveying · Lifting · Loading · Cleaning

+86 166 7576 2221
sufortran@gmail.com
Send an inquiry